
Guides · Foundations
Which foundation does an RTM home need?
Short answer
Your house sits on a foundation built on your lot.
A local contractor builds it to the house plan, while we build the house in Roseisle.
There are four main types: full basement, walk-out, crawlspace and piles.
Built in Roseisle. Delivered to your lot — no hassle.
How do the four types compare?
Type
Full basement
- Good for
- Extra rooms, storage, the furnace
- Watch for
- More digging; clay and high water need good drainage
Type
Walk-out
- Good for
- A sloped lot; windows and a door to the yard
- Watch for
- More grading
Type
Crawlspace
- Good for
- Flat lots, easy access to pipes
- Watch for
- Little storage; the furnace moves upstairs
Type
Piles
- Good for
- Wet or rocky ground, cottage lots
- Watch for
- No basement rooms; skirting and frost-proof pipes
How do soil, water and frost decide?
Prairie soil changes from lot to lot.
- Clay swells when wet and shrinks when dry. It usually needs engineered footings and good drainage.
- A high water table makes a deep basement harder. A crawlspace or piles often fit better.
- Frost. Footings or piles go below the frost line, or use a frost-protected design.
Have a local contractor or engineer look at your lot before you choose.
When is the foundation built?
At the same time as the house.
Order
You get a full set of stamped plans for your contractor.
Build
We build the house in Roseisle; your contractor builds the foundation.
Move day
The foundation is finished, level and square to the plan.
Delivery is about 6 months after you order. You move in at 7–8 months.
We move homes all year, except from March 1 to the end of May.
Planning a winter move? Pour concrete before the ground freezes, or choose piles.
What does move day need?
Room for the move
Movers often bring the house in on steel beams, roll it over the foundation and pull the beams out. On some lots a crane sets it down instead.
Access
Firm, clear ground from the road to the foundation, with room beside it for the trailer.
Level and square
The house comes completely finished, with wiring and plumbing stubbed through the floor. Walls and openings have to line up.
Clearance
Homes up to about 90 ft long, 36 ft wide and 18 ft high travel. Check your driveway and overhead lines.
Professional movers do the move. They take care of the road permits and insurance.
See how delivery works.
What does a basement add?
- Bedrooms for family or guests.
- A family room or an office.
- Storage for freezers and gear.
- The furnace, water heater and panel, out of the living space.
On a sloped lot, a walk-out turns the basement into a bright lower floor.
No basement? Plan a main-floor utility room. See choosing a floor plan.

Who does what?
We handle
Building the house in Roseisle, completely finished
- You usually handle
- Clearing, grading and a firm driveway
We handle
A full set of stamped plans
- You usually handle
- The foundation contractor
We handle
Hiring the moving company
- You usually handle
- Septic, well and power
We handle
Fixing hairline cracks after set-down
- You usually handle
- Connecting the stubbed plumbing and wiring
Foundation and hookups are listed at the bottom of your quote, so you see them before you sign.
Rated 4.9 ★ on Google.
Questions
What foundation does an RTM home need?
A full basement, a walk-out basement, a crawlspace or piles. A local contractor builds it on your lot, to the house plan, while we build the house.
Can an RTM home sit on screw piles?
Yes, if the piles are designed for the house plan and your soil. Piles suit wet or rocky lots. Plan a main-floor utility room and protect the pipes from frost.
Who builds the foundation?
You hire a local foundation contractor. We give you a full set of stamped plans for them. Foundation and hookups are listed at the bottom of your quote, so you see them before you sign.
When must the foundation be ready?
Before move day. Delivery is about 6 months after you order, so the foundation is built while the house is being built.
