How do you get a building permit for an RTM home?
Short answer
A new house needs a building permit, even when it arrives finished.
Your RM tells you who issues it and what to send.
Apply before the foundation goes in.
Built in Roseisle. Delivered to your lot — no hassle.
Who issues the permit?
In Manitoba, building and plumbing permits come from one of three places:
- Your municipality.
- Your planning district, if your RM is part of one.
- The province's Inspection and Technical Services, where neither of the above does it.
Start with a call to your RM office. They know which one covers your lot.
What do you usually send?
- House plans. We give you a full set of stamped plans.
- A site plan. Where the house, driveway, well and septic sit, and the distance to each property line.
- Foundation plans from your contractor.
- Other permits first, if your RM asks: a driveway, or access onto a provincial highway.
What do some RMs ask?
Every RM has its own rules. A few examples, from their own websites:
RM
Taché
- Worth knowing
- Apply online. Permits take about 1–3 weeks once everything is in. A new driveway needs its own permit; near a provincial highway, get the province's approval first. (RM of Taché)
RM
Alexander
- Worth knowing
- A permit is needed to place or relocate any building, whatever its size. (RM of Alexander)
RM
Macdonald
- Worth knowing
- Permits are usually required for new buildings. Inspectors check the work on site; book visits 48 hours ahead. (RM of Macdonald)
Rules change. Check with your RM before you start.
What about zoning?
Zoning decides what can be built on your lot.
Ask your RM about your zone before you pick a plan: setbacks from property lines, and any limits on house size or height.
What other permits are there?
Septic
In Manitoba, the system is registered with the province. See well and septic.
Electrical
Your electrician arranges it with the power utility.
Road permits for the move
Professional movers take care of the road permits and insurance. See how delivery works.
When do you apply?
Order
You get stamped plans.
Permit
Send them to your RM with your site plan.
Foundation
It goes in while we build the house.
Move day
About 6 months after you order. You move in at 7–8 months.
Building in Saskatchewan? Ask your RM office the same questions.
Rated 4.9 ★ on Google.
Questions
Does an RTM home need a building permit in Manitoba?
Yes. A new house needs a building permit, and usually a plumbing permit, under the Manitoba Building Code. Some RMs say placing a moved house on your lot needs one too.
Who issues the building permit?
One of three bodies, depending on where your lot is: your municipality, your planning district, or the province's Inspection and Technical Services. Call your RM office first; they will tell you which one.
When should I apply?
Before the foundation goes in. Your foundation is built while we build the house, so apply soon after you order.
What do I need for the application?
Usually the house plans and a site plan showing where the house sits on the lot. We give you a full set of stamped plans.